Yandicoogina Iron Ore Mine – High Pressure Mining Hoses for Tailings
Rio Tinto’s Yandicoogina iron ore mine is 85km north west of Newman and produces 60 million tonnes of iron ore per year. In 2014, we worked with design engineer Calibre and contractor Innotech on the construction of a new tailings pipeline.
The specifications of the new pipeline required the hose lengths to withstand a high working pressure. We custom manufactured the Slurryflex slurry hose with a precise 317.5mm internal diameter to match the ID of the steel pipeline and built them to comfortably handle the 45 bar (4,500kPa) working pressure.
Client
Design engineer Calibre
Year 2014
Project size $0.2M
Location WA

Related projects

Robe Valley Sustaining Project Overland Slurry Pipeline

Roy Hill Masters High Pressure, Abrasive Pipeline Challenges

Rio Tinto’s New Slurry Pipeline Uses 30% Less Spools
We're here to help
Got questions? Need advice? Tap into our experience and get specialist advice from our friendly team.


Slurry piping audits
Solve slurry piping maintenance problems for good. No more leaking pipes, no more unplanned shutdowns.