Wetar Copper Mine – SPI and Valve Package for Plant Expansion
In 2015, Finders Resources contracted GR Engineering to recommission its copper processing plant.
We worked with GR Engineering to supply and deliver a complete Special Piping Items (SPI) package. This included fire hydrants, hose reels, expansion joints and couplings, industrial hose assemblies, strainers, and safety showers. The package also included a range of Maric, safety relief, and air release valves.
Additionally, electrical contractor PT ODG engaged us to supply a range of actuated valves for the crushing and processing area of the plant. We assembled, tested, and tagged both packages in our Perth workshop ready for installation on site.
Client
Year 2015
Project size $0.5M
Items supplied 1212
Location Indonesia
Design engineer GR Engineering
![Wetar Copper Mine](https://www.beaverprocess.com.au/wp-content/uploads/2020/12/Wetar-Copper-Mine-banner-image-1200x675.jpg)
Related projects
![](https://www.beaverprocess.com.au/wp-content/uploads/2024/04/Roy-Hill-Cover-3-360x233.jpg)
How Roy Hill Solved Costly Unplanned Piping Maintenance for Good
![FMG Solomon iron ore mine CLX elbow](https://www.beaverprocess.com.au/wp-content/uploads/2020/12/FMG-Solomon-iron-ore-mine-CLX-elbow-Card-image-360x233.jpg)
8x Longer Lifespan for Cyclone Overflow Piping at FMG Solomon Mine
![](https://www.beaverprocess.com.au/wp-content/uploads/2024/04/Photos-from-Alex-360x233.jpg)