Talison Lithium – Slurryflex Hose for Long Lasting Tailings Pipeline
When planning a new 4km tailings pipeline, the Talison Lithium project team knew they needed flexibility.
It’s critical because rigid pipework must withstand thermal expansion, slurry pump vibration and changes in direction, bends or elevation.
They needed a set and forget option that could withstand higher pressures (up to 5000kPa), shock, vibration, and bending and flexing around dam contours and elevation.
That’s why they specified Slurryflex mining hose.
Our Brisbane factory built more than 250 metres of DN400 and DN250 hose and delivered it ready for installation.
We’re confident Slurryflex will give the flexibility – and durability – they need for a long-lasting tailings system.
Client
Application Tailings Pipeline
Year 2023
Location WA

Related projects

Robe Valley Sustaining Project Overland Slurry Pipeline

Roy Hill Masters High Pressure, Abrasive Pipeline Challenges

Rio Tinto’s New Slurry Pipeline Uses 30% Less Spools
We're here to help
Got questions? Need advice? Tap into our experience and get specialist advice from our friendly team.


Slurry piping audits
Solve slurry piping maintenance problems for good. No more leaking pipes, no more unplanned shutdowns.