Rosemont Gold Mine Upgrade – 493 Valves Assembled and Delivered
The Rosemont gold operation, located 100km north of Laverton, produces a crushed and milled ore product which is transported as a slurry and processed at the nearby Garden Well facility.
In 2013, Regis Resources engaged Mintrex and contractor Interquip to upgrade the pumping capacity of the ore slurry pipeline. This upgrade lifted the combined ore flow across both sites to seven million tonnes per year. We were the sole valve supplier of all 493 manual and actuated valves for the slurry pipeline which were assembled, tested, and supplied from our Perth workshop.
Client
Design engineer Mintrex
Year 2013
Project size $0.6M
Location WA
Valves supplied 493

Related projects

How Roy Hill Solved Costly Unplanned Piping Maintenance for Good

WA Lithium Mine get 12x Longer Wear Life in Slurry Control Valves

8x Longer Lifespan for Cyclone Overflow Piping at FMG Solomon Mine
We're here to help
Got questions? Need advice? Tap into our experience and get specialist advice from our friendly team.


Slurry piping audits
Solve slurry piping maintenance problems for good. No more leaking pipes, no more unplanned shutdowns.