Mt Cattlin Lithium Mine – Valve Actuation and Hose Package
In 2010, design engineer Mintrex and contractor Interquip engaged us to supply the manual valve and hose packages for the new Dense Media Separation (DMS) wet plant at Mt Cattlin lithium mine.
The Galaxy Resources project is located 2km north of Ravensthorpe in WA’s south coast region. The mine exports spodumene concentrate via the Esperance port.
We manufactured the mining hose in our Brisbane factory. Our Perth warehouse team assembled, tested, and tagged the valves ready for installation on site.
Mintrex successfully commissioned the new plant in August 2010.
Client
Galaxy Resources client logo
Year 2010
Project Size $0.1M
Design Engineer Mintrex
![Mt Cattlin Lithium Mine Processing Plant](https://www.beaverprocess.com.au/wp-content/uploads/2021/03/Mt-Cattlin-lithium-processing-plant-banner-1200x675.jpg)
Related projects
![](https://www.beaverprocess.com.au/wp-content/uploads/2024/04/Roy-Hill-Cover-3-360x233.jpg)
How Roy Hill Solved Costly Unplanned Piping Maintenance for Good
![FMG Solomon iron ore mine CLX elbow](https://www.beaverprocess.com.au/wp-content/uploads/2020/12/FMG-Solomon-iron-ore-mine-CLX-elbow-Card-image-360x233.jpg)
8x Longer Lifespan for Cyclone Overflow Piping at FMG Solomon Mine
![](https://www.beaverprocess.com.au/wp-content/uploads/2024/04/Photos-from-Alex-360x233.jpg)