Mako Gold Mine – 2300-Item Valve SPI Package Delivered for New Plant
In 2017, Lycopodium engaged us to provide the manual valve and the Special Piping Item (SPI) packages for Resolute Mining’s new Mako gold processing plant, 650km from the capital Dakar in southeast Senegal.
The SPI package included industrial hose assemblies, mining hose, spray nozzles, expansion joints and Victaulic couplings. A range of manual valves were also included to be used throughout the plant. In total we assembled, tagged, and tested 2300 items in our Perth workshop, then delivered to site for installation by the on-site team.
Client
Year 2017
Project size $0.7M
Items supplied 2300
Location Senegal
Design engineer Lycopodium

Related projects

How Roy Hill Solved Costly Unplanned Piping Maintenance for Good

WA Lithium Mine get 12x Longer Wear Life in Slurry Control Valves

8x Longer Lifespan for Cyclone Overflow Piping at FMG Solomon Mine
We're here to help
Got questions? Need advice? Tap into our experience and get specialist advice from our friendly team.


Slurry piping audits
Solve slurry piping maintenance problems for good. No more leaking pipes, no more unplanned shutdowns.