Cape Lambert Power Station – SPI Package Delivered for New Station
In 2016, Rio Tinto engaged Clough to build a new power station to replace an old low-efficiency station at Cape Lambert in WA’s Pilbara region. The new station has two gas turbines and a steam turbine to deliver 120MW of power. This supports an iron ore production capacity of 333 million tonnes per year.
Clough and contractor RCR Mining Technologies engaged us to provide the special piping items package for the station. This included valve strainers, valves, monolithic isolation joints, pipe fittings, and industrial hose assemblies. Our team assembled, tested, and tagged everything in our Perth workshop and delivered it to site ready for installation.
Client
Design engineer Clough
Year 2016
Project size $0.2M
Location WA
![](https://www.beaverprocess.com.au/wp-content/uploads/2020/11/Cape-Lambert-banner-image-1200x675.jpg)
Related projects
![](https://www.beaverprocess.com.au/wp-content/uploads/2020/11/Yarnima-power-station-card-image-360x233.jpg)
Yarnima Power Station – Expansion Joints & Strainers for Water Cooling
![](https://www.beaverprocess.com.au/wp-content/uploads/2020/11/West-Angelas-power-station-card-image-360x233.jpg)
West Angelas Power Station – Valve Package for Gas Turbines
![](https://www.beaverprocess.com.au/wp-content/uploads/2020/10/South-Hedland-Power-Work-Example-Card-Image-360x233.jpg)
South Hedland Power Station – Technical Expertise and SPI Package
We're here to help
Got questions? Need advice? Tap into our experience and get specialist advice from our friendly team.
![](https://www.beaverprocess.com.au/wp-content/uploads/2020/10/Rithik-w-Drawings-633px-416x527.png)
![](https://www.beaverprocess.com.au/wp-content/uploads/2020/10/Rithik-w-Drawings-633px.png)
Slurry piping audits
Solve slurry piping maintenance problems for good. No more leaking pipes, no more unplanned shutdowns.