We love a good design challenge. So, our piping specialists designed a one-piece mining hose that forms the best possible geometry, and removes any internal bumps, so it’s smooth all the way around.
This new 180° Slurryflex pre-formed mining hose bend means:
– No beads or joins to reduce high-wear areas
– It’s more durable than HDPE
– It’s flexible and corrects misalignment
– It absorbs mechanical impact/shock
– It’s easier to install as a single spool
This upgrade will reduce maintenance costs and downtime at Telfer—and means one less thing for the team to worry about.
Now they can ‘set and forget’ their cyclone overflow piping and focus on optimising other areas of the plant.
Related projects
How Roy Hill Solved Costly Unplanned Piping Maintenance for Good
WA Lithium Mine get 12x Longer Wear Life in Slurry Control Valves
8x Longer Lifespan for Cyclone Overflow Piping at FMG Solomon Mine
We're here to help
Got questions? Need advice? Tap into our experience and get specialist advice from our friendly team.
Slurry piping audits
Solve slurry piping maintenance problems for good. No more leaking pipes, no more unplanned shutdowns.